System 3E Perlite Blocks

System 3E perlite blocks – single-layer external wall without additional insulation.

Nordicclad helps choose the System 3E solution, verify the project's initial data, and organize the quotation and delivery of products. The technical solution is always confirmed based on the project and the manufacturer's documentation.

System 3E Perlite Element
• Single-layer external wall
• Dry installation (mortarless)
• CE certificate / DoP declarations
• Fire resistance according to classification report
Technological distinctiveness

Why is the system different?

System 3E's patented perlite elements ensure a comprehensive wall solution without standard mortar or additional insulation.

🧱

One material layer

The external wall solution is based on perlite elements and does not require separate block glue or mortar. The exact structure is determined by the project.

🧩

Dry installation

Elements are connected dry according to the manufacturer's system. This simplifies work organization and reduces wet processes on the construction site.

📐

Designable as a whole

Openings, corners, lintels, and connections are solved according to the system's elements and the manufacturer's instructions.

📜

Documented performance

Technical characteristics are presented based on declarations of performance, classification reports, and technical data sheets.

Solutions by role

Who is System 3E for?

For private home builders

A clear overview of suitability, budget baseline data, and ordering without complex construction risks.

For architects and designers

Nodes, technical values, CAD/BIM files, and manufacturer consultation in building design.

For Builders

Installation instructions, elements, logistics, work organization, and technical support on the construction site.

For developers

Repeated solutions, quantity budgeting, delivery planning, and early control of project risks.

From project to delivery

5-step process

How cooperation takes place in project preparation and delivery organization.

01

Sending the project

The customer sends project drawings or initial data to us for review.

02

Input check

Nordicclad checks the completeness of the initial data and asks for clarifications if necessary.

03

Technical approval

The technical solution and quantities of elements are approved based on the manufacturer's documentation.

04

Offer & Delivery Plan

An exact offer, delivery plan, and limits of responsibility are prepared.

05

Order & Project Support

After confirmation, delivery and necessary technical support during construction are organized.

Do you have a project ready?

Choose a suitable option and our engineers will help you move forward.

Yes, I will upload the files No, I need a consultation first